
Controls & Retrofit — Washington Township, NJ
Westwood High School Controls Upgrade
Westwood High School — Washington Township, NJ
Project Overview
Westwood High School in Washington Township, NJ operates eight Patterson-Kelley MACH C2000 high-efficiency condensing boilers. Two units had been upgraded to the current NURO control platform, while six still operated on the legacy ENVI system — creating inconsistency in monitoring, diagnostics, and maintenance procedures.
ICA installed six NURO upgrade kits — including new sheet metal panels, factory-tested wiring harnesses, and manufacturer branding — bringing all legacy boilers up to the current NURO specification. The entire boiler plant now operates on a standardized control platform, simplifying monitoring, troubleshooting, and ongoing maintenance for facility staff.
Project Details
- ClientWestwood High School
- Facility TypeK-12 Education
- LocationWashington Township, NJ
- Equipment
- Project TypeControls & Retrofit
- Key Result8 boilers standardized to NURO
- Scope of Work
- 8x Patterson-Kelley MACH C2000 boilers
- 6x NURO upgrade kits installed on legacy ENVI units
- 2x existing NURO-equipped units
- New sheet metal panels and factory-tested wiring harnesses
- Controls standardization across entire boiler plant
Project Gallery
Installation Photos



More From ICA
Related Projects

Jersey City, NJ
Liberty Science Center Hydronic Heating
Three Patterson-Kelley MACH C-2500 condensing boilers with NURO controls providing hydronic heating to Liberty Science Center with ±0.5°F precision.

Haworth, NJ
Suez Water Treatment Plant
Two Patterson-Kelley MACH C1050 condensing boilers with 10:1 mechanical turndown providing hydronic heating to the water treatment facility.

Wanaque, NJ
North Jersey Water District Office Building
Two Patterson-Kelley SONIC SC4000 stainless steel condensing boilers with DUET heat exchanger technology — 97% efficiency at high fire, 100% at low fire.
ICA Heating — Since 1974
Ready to Start
Your Project?
Your Project?