(800) 994-6164Mon–Fri: 8AM – 5PM EST
(800) 994-6164
Mon–Fri: 8AM – 5PM EST
Request a Quote
Westwood High School Controls Upgrade
ProjectsWestwood High School Controls Upgrade
Controls & Retrofit — Washington Township, NJ

Westwood High School Controls Upgrade

Westwood High School — Washington Township, NJ

Project Overview

Westwood High School in Washington Township, NJ operates eight Patterson-Kelley MACH C2000 high-efficiency condensing boilers. Two units had been upgraded to the current NURO control platform, while six still operated on the legacy ENVI system — creating inconsistency in monitoring, diagnostics, and maintenance procedures.

ICA installed six NURO upgrade kits — including new sheet metal panels, factory-tested wiring harnesses, and manufacturer branding — bringing all legacy boilers up to the current NURO specification. The entire boiler plant now operates on a standardized control platform, simplifying monitoring, troubleshooting, and ongoing maintenance for facility staff.

Project Details
  • ClientWestwood High School
  • Facility TypeK-12 Education
  • LocationWashington Township, NJ
  • Equipment
    Patterson-KelleyNURO Controls
  • Project TypeControls & Retrofit
  • Key Result8 boilers standardized to NURO
  • Scope of Work
    • 8x Patterson-Kelley MACH C2000 boilers
    • 6x NURO upgrade kits installed on legacy ENVI units
    • 2x existing NURO-equipped units
    • New sheet metal panels and factory-tested wiring harnesses
    • Controls standardization across entire boiler plant
ICA Heating — Since 1974
Ready to Start
Your Project?