(800) 994-6164Mon–Fri: 8AM – 5PM EST
(800) 994-6164
Mon–Fri: 8AM – 5PM EST
Request a Quote
ProjectsNJ Commercial Condensing Boiler Upgrade
Controls & Retrofit — New Jersey

NJ Commercial Condensing Boiler Upgrade

NJ Commercial Facility — New Jersey

Project Overview

A New Jersey commercial facility modernized its aging boiler system with a Parker oil-fired condensing boiler and Siemens LMV3 combustion controls to improve reliability and reduce fuel consumption.

ICA assessed the existing system's load patterns and hydronic temperatures, verified venting and condensate handling requirements, coordinated with the installing contractor on combustion air and flue routing, and confirmed mechanical room layout and clearances. After installation, ICA performed burner startup, control parameter configuration, and trained plant staff on setpoints, trending, and alarm handling.

The upgrade delivered smoother modulation with fewer on/off cycles, more consistent heating performance, improved part-load efficiency, and enhanced operational visibility for plant staff through the Siemens controls platform.

Project Details
  • ClientNJ Commercial Facility
  • Facility TypeCommercial / Industrial
  • LocationNew Jersey
  • Equipment
    ParkerSiemens
  • Project TypeControls & Retrofit
  • Scope of Work
    • Parker oil-fired condensing boiler
    • IC burner installation
    • Siemens LMV3 control module
    • RWF55 temperature/pressure controller
    • Load pattern assessment and system sizing
    • Combustion air and flue routing coordination
    • Burner startup and control parameter configuration
    • Plant staff training on setpoints, trends, and alarms
ICA Heating — Since 1974
Ready to Start
Your Project?