(800) 994-6164Mon–Fri: 8AM – 5PM EST
(800) 994-6164
Mon–Fri: 8AM – 5PM EST
Request a Quote
Brookdale Community College Central Plant
ProjectsBrookdale Community College Central Plant
Boiler Installation — Lincroft, NJ

Brookdale Community College Central Plant

Brookdale Community College — Lincroft, NJ

Project Overview

ICA furnished and installed a complete fabricated hydronic heating system for Brookdale Community College's central utility plant in Lincroft, NJ. The system features eight Patterson-Kelley MACH C3000 high-efficiency cast aluminum condensing boilers with a custom PLC-based control panel, serving the entire campus.

Since the initial startup in 2011, ICA has provided routine annual preventive maintenance to keep the system running at peak performance. The boilers have logged nearly 330,000 combined run hours with an average of 17.5 run hours per ignition cycle — a testament to proper sizing, controls programming, and ongoing maintenance. The system operates at 90% low-fire efficiency settings, maximizing fuel savings across variable campus heating loads.

Project Details
  • ClientBrookdale Community College
  • Facility TypeHigher Education — Central Utility Plant
  • LocationLincroft, NJ
  • Equipment
    Patterson-Kelley
  • Project TypeBoiler Installation
  • Key Result330,000+ combined run hours
  • Scope of Work
    • 8x Patterson-Kelley MACH C3000 condensing boilers
    • Custom PLC-based control panel
    • Complete fabricated hydronic heating system
    • Campus-wide distribution from central plant
    • Ongoing annual preventive maintenance since 2011
ICA Heating — Since 1974
Ready to Start
Your Project?